GURUFOCUS.COM » STOCK LIST » Industrials » Construction » MasTec Inc (NYSE:MTZ) » Definitions » Backlog for Engineering Construction (USD Mil)

MasTec (MasTec) Backlog for Engineering Construction (USD Mil) : 12,407.00 (As of Dec. 2023)


View and export this data going back to 1990. Start your Free Trial

What is MasTec Backlog for Engineering Construction (USD Mil)?

Backlog for Engineering Construction (USD Mil) refers to the quantity and money amount of the product which has been ordered by customers but which has not shipped yet for engineering construction.

MasTec's Backlog for Engineering Construction (USD Mil) for the quarter that ended in Dec. 2023 was 12,407.00 , which lower from pervious quarter (Sep. 2023)'s result by 0.66%.

MasTec's Backlog for Engineering Construction (USD Mil) for the annual that ended in Dec. 2023 was 12,407.00 , which lower from pervious year (Dec. 2022)'s result by 4.41%.

The historical rank and industry rank for MasTec's Backlog for Engineering Construction (USD Mil) or its related term are showing as below:

MTZ's Backlog for Engineering Construction (USD Mil) is not ranked *
in the Construction industry.
Industry Median:
* Ranked among companies with meaningful Backlog for Engineering Construction (USD Mil) only.

MasTec Backlog for Engineering Construction (USD Mil) Historical Data

The historical data trend for MasTec's Backlog for Engineering Construction (USD Mil) can be seen below:

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

* Premium members only.

MasTec Backlog for Engineering Construction (USD Mil) Chart

MasTec Annual Data
Trend Dec19 Dec20 Dec21 Dec22 Dec23
Backlog for Engineering Construction (USD Mil)
Get a 7-Day Free Trial Premium Member Only Premium Member Only

MasTecQuarterly Data
Trend Sep18 Mar19 Jun19 Sep19 Mar20 Jun20 Sep20 Dec20 Mar21 Jun21 Sep21 Dec21 Mar22 Jun22 Sep22 Dec22 Mar23 Jun23 Sep23 Dec23
Backlog for Engineering Construction (USD Mil)
Get a 7-Day Free Trial Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only

Competitive Comparison of MasTec's Backlog for Engineering Construction (USD Mil)

For the Engineering & Construction subindustry, MasTec's Backlog for Engineering Construction (USD Mil), along with its competitors' market caps and Backlog for Engineering Construction (USD Mil) data, can be viewed below:

* Competitive companies are chosen from companies within the same industry, with headquarter located in same country, with closest market capitalization; x-axis shows the market cap, and y-axis shows the term value; the bigger the dot, the larger the market cap. Note that "N/A" values will not show up in the chart.


MasTec  (NYSE:MTZ) Backlog for Engineering Construction (USD Mil) Explanation

Backlog refers to the quantity and money amount of the product which has been ordered by customers but which has not shipped yet. Each backlog includes the following information: job order number, product number, delivery date, quantity, the order status (i.e. showing that it is now being assembled, or when delivery is being planned).

The backlog reflects the company’s inventory management processing level. We usually consider a low backlog number to be a sign of good inventory management. If the backlog is too big, it can lead to customer frustration and canceled orders. A healthy backlog shows that the product or service of the company is in-demand and seeing steady growth.


MasTec (MasTec) Business Description

Industry
GURUFOCUS.COM » STOCK LIST » Industrials » Construction » MasTec Inc (NYSE:MTZ) » Definitions » Backlog for Engineering Construction (USD Mil)
Traded in Other Exchanges
Address
800 S. Douglas Road, 12th Floor, Coral Gables, FL, USA, 33134
MasTec is a leading infrastructure construction company operating mainly in North America across a range of industries. The company's primary activities include the engineering, building, installation, maintenance, and upgrade of communications, oil and gas, utility, renewable energy, and other infrastructure. MasTec reports its results under five reportable segments: 1) communications; 2) clean energy and infrastructure; 3) oil and gas; 4) power delivery, and 5) other.
Executives
Paul Dimarco officer: CFO 800 S. DOUGLAS ROAD, SUITE 1200, CORAL GABLES FL 33134
Timothy Michael Love officer: CAO 8915 GEORGE WILLIAMS RD., KNOXVILLE TN 37923
Ava L Parker director 1469 HARRINGTON PARK DRIVE, JACKSONVILLE FL 32225
Ernst N Csiszar director 2600 S RIVER ROAD, DES PLAINES IL 60018
Robert E Apple officer: Chief Operations Officer 800 S DOUGLAS ROAD, 12TH FLOOR, CORAL GABLES FL 33134
C Robert Campbell officer: EVP & CFO 800 DOUGLAS ROAD, 12TH FLOOR, CORAL GABLES FL 33134
De Cardenas Alberto I officer: Executive Vice President 800 S DOUGLAS ROAD, 12TH FLOOR, CORAL GABLES X1 33134
George Pita officer: CFO 3000 NW 107TH AVENUE, MIAMI FL 33172
Robert J Dwyer director 880 SOUTH OCEAN BOULEVARD, PALM BEACH FL 33480
Jose S Sorzano director AUSTIN GROUP INC, 5305 LEE HIGHWAY NORTH, ARLINGTON VA 22207
Julia L Johnson director NETCOMMUNICATIONS LLC, 614 GRAND HIGHWAY, CLAREMONT FL 34711
Javier Alberto Palomarez director 3405 PINNEY POINT DRIVE, FLOWER MOUND TX 75022
Jorge Mas director, 10 percent owner 800 DOUGLAS ROAD, 12TH FLOOR, CORAL GABLES FL 33134
Jose Ramon Mas director, officer: EVP 800 DOUGLAS ROAD, 12TH FLOOR, CORAL GABLES FL 33134
Daniel A Restrepo director C/O MASTEC, INC., 800 S. DOUGLAS RD., 12TH FLOOR, CORAL GABLES FL 33134