Aztec Reports Final Phase 1 Drill Results for Tombstone Project in Southeastern Arizona, Intersects 6.36 gpt Gold Equivalent over 7.62 m and 0.62 gpt Gold Equivalent over 140.21m
- Final 5 drill holes encountered significant gold and silver intercepts expanding mineralization north and south of the Central drill pattern
- High-grade gold-silver intercepts include 6.36 gpt AuEq over 7.62 m
- Thick gold-silver intervals include 0.62 gpt AuEq over 140.21 m
- 19 holes of 21 holes completed in 2,993 meters Phase 1 drilling program encountered significant near surface oxide gold-silver mineralization