Aztec Reports Final Phase 1 Drill Results for Tombstone Project in Southeastern Arizona, Intersects 6.36 gpt Gold Equivalent over 7.62 m and 0.62 gpt Gold Equivalent over 140.21m

Author's Avatar
Dec 22, 2020
Article's Main Image
  • Final 5 drill holes encountered significant gold and silver intercepts expanding mineralization north and south of the Central drill pattern
  • High-grade gold-silver intercepts include 6.36 gpt AuEq over 7.62 m
  • Thick gold-silver intervals include 0.62 gpt AuEq over 140.21 m
  • 19 holes of 21 holes completed in 2,993 meters Phase 1 drilling program encountered significant near surface oxide gold-silver mineralization