McDermott Announces Planned J-Lay Modifications for Pipelay and Construction Vessel Amazon

Author's Avatar
Aug 01, 2018
Article's Main Image

- Amazon modifications will add multi-joint (hex) J-Lay system to handle the most challenging ultra-deepwater projects

- Innovative design with increased automation and extensive storage areas expected to allow for continuous operations and lower operational costs

- Vessel modifications will include the addition of a multi-joint facility, dual pipe loading cranes and additional power generation

PR Newswire