Emerald Bay Energy Provides Update on Operations at Isabella #2

Author's Avatar
Jun 20, 2019
Article's Main Image

CALGARY, AB and SAN ANTONIO, TX / ACCESSWIRE / June 20, 2019 / Emerald Bay Energy Inc. (TSX Venture: EBY, OTC: EMBYF) (the "Company" or "Emerald Bay") reported today on operations at the Isabella #2 well in Gonzales County, Texas. Hydraulic fracturing of the Navarro formation has been completed, and the well has been swabbed for a total of 28 days to recover the frac fluids and measure in-flow rates. In addition to the swabbing operations, the well has intermittently been shut in to monitor pressure builds. Approximately 75% of the 2,132 barrels of fluids used to frac the well have been recovered during swabbing operations, but no measurable quantities of hydrocarbons from the Navarro formation have been observed to this point. The well has been shut in for the past 9 days to allow time to monitor pressure builds.