Mostostal Plock (WAR:MSP) Backlog for Engineering Construction (USD Mil)

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

WAR:MSP Mostostal Plock SA WAR:MSP
64 GF Score
Price zł13.65
GF Value zł23.14
Valuation Possible Value Trap
! 3 Warning Signs
View Full Analysis

What is Mostostal Plock Backlog for Engineering Construction (USD Mil)?

Backlog for Engineering Construction (USD Mil) only apply to companies which has operating data in Engineering Construction industry.

WAR:MSP
64GF Score
Mostostal Plock SA WAR:MSP
Backlog for Engineering Construction (USD Mil) is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Is Mostostal Plock (WAR:MSP) Overvalued in 2026?

Based on GuruFocus' analysis, Mostostal Plock stock appears to be undervalued. The current stock price of zł13.65 is trading 41% below its estimated GF Value™ of zł23.14. GuruFocus considers Mostostal Plock to be Possible Value Trap.

Key valuation signals for WAR:MSP:

  • Backlog for Engineering Construction (USD Mil):
  • GF Value™: zł23.14 vs. price of zł13.65 (41% below fair value)
  • GF Score™: 64/100 with 3 warning signs

No single metric tells the full story. See the WAR:MSP stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


Mostostal Plock Business Description

Address ul. Targowa 12, Plock, POL, 09-400
Mostostal Plock SA operates in the construction and assembly industry. It provides service such as construction and assembly of tanks, pipelines and industrial equipment, execution and assembly of steel, light, medium and heavy structures.
64GF Score

Get the complete analysis for WAR:MSP

Backlog for Engineering Construction (USD Mil) is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

zł13.65
Price
zł23.14
GF Value