Kalo Gold Drills Additional Thick, Near-Surface, High-Grade Gold Mineralization, with 69m at 0.91 G/T Au (Including 4m of 5.11 G/T Au), at Vatu Aurum Gold Project in Fiji

Author's Avatar
Jul 13, 2021

VANCOUVER, BC / ACCESSWIRE / JULY 13, 2021 / KALO GOLD HOLDINGS CORP. (TSX.V: KALO) ("Kalo Gold," or the "Company"), is pleased to announce the results from two additional drill holes which both intersected thick, near surface, gold mineralization at Qiriyaga Hill at Kalo Gold's 100% owned, large 36sqkm, Vatu Aurum gold project in the South Pacific's Ring of Fire, in Fiji. The drill holes are part of the Phase 1 Program, where a total of 4 holes have now been reported of the 8 hole, 1,800m program.