Unity Completes Phase Two Surface Drilling at Hewitt Point

Author's Avatar
Jun 10, 2019
Article's Main Image

VANCOUVER, CANADA / ACCESSWIRE / June 10, 2019 / Unity Metals Corp. ("Unity" or the "Company") (TSXV: UTY) is pleased to announce the completion of the phase two investigation of the Hewitt Point adit and shear with Shaw backpack drills. The four-man crew completed 27 short holes for a total of 40.85m. The deepest hole extended hole HW19-04 from 2.06m to a depth of 5.0m. The upper interval (0 - 2.06m) derived from the initial investigation at the Hewitt Point adit assayed 6.18g/t Au and 8.1g/t Ag. (For more information see the Company's news release of May 20, 2019.) In addition, several other holes were drilled to a depth of over 3.5m to test the Hewitt vein system along strike from this hole.