Expo Engineering And Projects (BOM:526614) Float Percentage Of Total Shares Outstanding: 0.00% (As of Aug. 13, 2026)

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

BOM:526614 Expo Engineering And Projects Ltd BOM:526614
57 GF Score
Price ₹82.00
GF Value ₹37.23
Valuation Significantly Overvalued
! 5 Warning Signs
View Full Analysis

What is Expo Engineering And Projects Float Percentage Of Total Shares Outstanding?

Expo Engineering And Projects BOM:526614 -0.35% 57 Float Percentage Of Total Shares Outstanding is 0.00% as of Aug. 13, 2026. GuruFocus rates BOM:526614 with a GF Score™ of 57/100 and a GF Value™ of ₹37.23 (Significantly Overvalued). The stock has 5 warning signs investors should review.

Float percentage of total shares outstanding is the percentage of float shares relative to the total shares outstanding. As of today, Expo Engineering And Projects's float shares is 0.00 Mil. Expo Engineering And Projects's total shares outstanding is 22.80 Mil. Expo Engineering And Projects's float percentage of total shares outstanding is 0.00%.

Insider Ownership is the percentage of shares that are owned by company insiders relative to the total shares outstanding. As of today, Expo Engineering And Projects's Insider Ownership is 0.00%.

Institutional Ownership is the percentage of shares that are owned by institutions out of the total shares outstanding. As of today, Expo Engineering And Projects's Institutional Ownership is 0.00%.

BOM:526614
57GF Score
Expo Engineering And Projects Ltd BOM:526614
Float Percentage Of Total Shares Outstanding is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Expo Engineering And Projects Float Percentage Of Total Shares Outstanding Calculation

It is the percentage of float shares out of the total shares outstanding.

Expo Engineering And Projects's Float Percentage of Total Shares Outstanding for today is calculated as follows:

Float Percentage of Total Shares Outstanding=Float Shares/Total Shares Outstanding
=0.00/22.80
=0.00%

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

What does a Float Percentage Of Total Shares Outstanding of 0.00% mean?
Expo Engineering And Projects (BOM:526614) has a Float Percentage Of Total Shares Outstanding of 0.00% as of Aug. 13, 2026. Float percent of shares outstanding equals the percent of float shares relative to total shares. View historical data on Expo Engineering And Projects and its competitors.
Is Expo Engineering And Projects' Float Percentage Of Total Shares Outstanding too high?
Expo Engineering And Projects' current Float Percentage Of Total Shares Outstanding is 0.00%. Overall, Expo Engineering And Projects has a GF Score™ of 57/100 and is considered Significantly Overvalued, reflecting its overall financial health beyond just this single metric.
How does Expo Engineering And Projects' Float Percentage Of Total Shares Outstanding compare to PWR and FIX?
Expo Engineering And Projects' Float Percentage Of Total Shares Outstanding of 0.00% can be compared against companies in the Construction industry. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good Float Percentage Of Total Shares Outstanding for a Construction company?
A good Float Percentage Of Total Shares Outstanding depends on the Construction industry context. However, Float Percentage Of Total Shares Outstanding should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high Float Percentage Of Total Shares Outstanding mean?
A high Float Percentage Of Total Shares Outstanding can signal that a stock is expensive relative to its fundamentals. Float percent of shares outstanding equals the percent of float shares relative to total shares. View historical data on Expo Engineering And Projects and its competitors. Expo Engineering And Projects's current Float Percentage Of Total Shares Outstanding is 0.00%. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is Expo Engineering And Projects stock overvalued right now?
Based on GuruFocus' analysis, Expo Engineering And Projects (BOM:526614) is currently considered Significantly Overvalued. The stock's GF Value™ is ₹37.23, compared to a current price of ₹82.00 — trading 120.3% above its estimated fair value. The current Float Percentage Of Total Shares Outstanding is 0.00%. Expo Engineering And Projects' overall GF Score™ is 57/100 with 5 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is Float Percentage Of Total Shares Outstanding calculated?
Float Percentage Of Total Shares Outstanding is calculated from a company's financial statements. For Expo Engineering And Projects (BOM:526614), the current Float Percentage Of Total Shares Outstanding is 0.00% as of Aug. 13, 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is Expo Engineering And Projects (BOM:526614) Overvalued in 2026?

Based on GuruFocus' analysis, Expo Engineering And Projects stock appears to be overvalued. The current stock price of ₹82.00 is trading 120.3% above its estimated GF Value™ of ₹37.23. GuruFocus considers Expo Engineering And Projects to be Significantly Overvalued.

Key valuation signals for BOM:526614:

  • Float Percentage Of Total Shares Outstanding: 0.00%
  • GF Value™: ₹37.23 vs. price of ₹82.00 (120.3% above fair value)
  • GF Score™: 57/100 with 5 warning signs

No single metric tells the full story. See the BOM:526614 stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


Expo Engineering And Projects Business Description

Address 150, Sheriff Devji Street, Expo House, Mumbai, MH, IND, 400003
Expo Engineering And Projects Ltd is an engineering and construction company. The company is involved in three business segments: Process Plant Equipment Manufacturing, On-Site Engineering Projects, and Maintenance & Inspection Services. The company manufactures various process plant equipment such as pressure vessels, deaerators, towers, horton spheres, heat exchangers, and reactors among others. It is also involved in site engineering projects along with providing services related to project piping, fabrication and erection of structural equipment, and maintenance shutdown revamp. The company's products and services are predominantly utilized in the oil, gas, petrochemical, fertilizer, and steel Industries.
57GF Score

Get the complete analysis for BOM:526614

Float Percentage Of Total Shares Outstanding is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

₹82.00
Price
₹37.23
GF Value