Laxmipati Engineering Works (BOM:537669) Construction In Progress: ₹69.3 Mil (As of Mar. 2026)


BOM:537669 Laxmipati Engineering Works Ltd BOM:537669
65 GF Score
Price ₹557.00
GF Value ₹318.65
Valuation Significantly Overvalued
! 3 Warning Signs
View Full Analysis

What is Laxmipati Engineering Works Construction In Progress?

Laxmipati Engineering Works BOM:537669 65 Construction In Progress is ₹69.3 Mil as of Mar. 2026. GuruFocus rates BOM:537669 with a GF Score™ of 65/100 and a GF Value™ of ₹318.65 (Significantly Overvalued). The stock has 3 warning signs investors should review.

Laxmipati Engineering Works's quarterly construction in progress stayed the same from Mar. 2025 (₹15.9 Mil) to Sep. 2025 (₹15.9 Mil) but then increased from Sep. 2025 (₹15.9 Mil) to Mar. 2026 (₹69.3 Mil).

Laxmipati Engineering Works's annual construction in progress stayed the same from Mar. 2024 (₹15.9 Mil) to Mar. 2025 (₹15.9 Mil) but then increased from Mar. 2025 (₹15.9 Mil) to Mar. 2026 (₹69.3 Mil).


Laxmipati Engineering Works Construction In Progress Historical Data

* Premium members only.

The historical data trend for Laxmipati Engineering Works's Construction In Progress can be seen below:

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

Laxmipati Engineering Works Construction In Progress Chart

Laxmipati Engineering Works Annual Data
Trend Mar17 Mar18 Mar19 Mar20 Mar21 Mar22 Mar23 Mar24 Mar25 Mar26
Construction In Progress
Get a 7-Day Free Trial Premium Member Only Premium Member Only 67.52 15.89 15.89 15.89 69.27

Laxmipati Engineering Works Semi-Annual Data
Sep16 Mar17 Sep17 Mar18 Sep18 Mar19 Sep19 Mar20 Sep20 Mar21 Sep21 Mar22 Sep22 Mar23 Sep23 Mar24 Sep24 Mar25 Sep25 Mar26
Construction In Progress Get a 7-Day Free Trial Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only 15.89 158.92 15.89 15.89 69.27
BOM:537669
65GF Score
Laxmipati Engineering Works Ltd BOM:537669
Construction In Progress is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Laxmipati Engineering Works Construction In Progress Calculation

It records the cost of construction work, which is not yet completed (typically, applied to capital budget items). A construction in progress item is not depreciated until the asset is placed in service. Normally, upon completion, a construction in progress item is reclassified, and the reclassified asset is capitalized and depreciated.

What does a Construction In Progress of ₹69.3 Mil mean?
Laxmipati Engineering Works (BOM:537669) has a Construction In Progress of ₹69.3 Mil as of Mar. 2026. Construction in Progress records the amount of construction work that is not complete. View historical data on Laxmipati Engineering Works and its competitors.
Is Laxmipati Engineering Works' Construction In Progress too high?
Laxmipati Engineering Works' current Construction In Progress is ₹69.3 Mil. Overall, Laxmipati Engineering Works has a GF Score™ of 65/100 and is considered Significantly Overvalued, reflecting its overall financial health beyond just this single metric.
How does Laxmipati Engineering Works' Construction In Progress compare to SPCX and GE?
Laxmipati Engineering Works' Construction In Progress of ₹69.3 Mil can be compared against companies in the Aerospace & Defense industry. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good Construction In Progress for an Aerospace & Defense company?
A good Construction In Progress depends on the Aerospace & Defense industry context. However, Construction In Progress should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high Construction In Progress mean?
A high Construction In Progress can signal that a stock is expensive relative to its fundamentals. Construction in Progress records the amount of construction work that is not complete. View historical data on Laxmipati Engineering Works and its competitors. Laxmipati Engineering Works's current Construction In Progress is ₹69.3 Mil. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is Laxmipati Engineering Works stock overvalued right now?
Based on GuruFocus' analysis, Laxmipati Engineering Works (BOM:537669) is currently considered Significantly Overvalued. The stock's GF Value™ is ₹318.65, compared to a current price of ₹557.00 — trading 74.8% above its estimated fair value. The current Construction In Progress is ₹69.3 Mil. Laxmipati Engineering Works' overall GF Score™ is 65/100 with 3 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is Construction In Progress calculated?
Construction In Progress is calculated from a company's financial statements. For Laxmipati Engineering Works (BOM:537669), the current Construction In Progress is ₹69.3 Mil as of Mar. 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is Laxmipati Engineering Works (BOM:537669) Overvalued in 2026?

Based on GuruFocus' analysis, Laxmipati Engineering Works stock appears to be overvalued. The current stock price of ₹557.00 is trading 74.8% above its estimated GF Value™ of ₹318.65. GuruFocus considers Laxmipati Engineering Works to be Significantly Overvalued.

Key valuation signals for BOM:537669:

  • Construction In Progress: ₹69.3 Mil
  • GF Value™: ₹318.65 vs. price of ₹557.00 (74.8% above fair value)
  • GF Score™: 65/100 with 3 warning signs

No single metric tells the full story. See the BOM:537669 stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


Laxmipati Engineering Works Business Description

Address Central Park Society, Office Block, 1st Floor, Plot No. 237/2 and 3, Sub Plot No. A/25, GIDC, Pandesara, Surat, GJ, IND, 394221
Laxmipati Engineering Works Ltd is engaged in the business of fabrication, heavy engineering, engineering infrastructure and services, and shut down maintenance projects. The company has two segments: Fabrication and Shipyard.
65GF Score

Get the complete analysis for BOM:537669

Construction In Progress is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

₹557.00
Price
₹318.65
GF Value