Mostostal Zabrze-Holding (FRA:V51) Construction In Progress: €0.0 Mil (As of Mar. 2026)


FRA:V51 Mostostal Zabrze-Holding SA FRA:V51
58 GF Score
Price €1.42
GF Value €1.11
Valuation Modestly Overvalued
! 9 Warning Signs
View Full Analysis

What is Mostostal Zabrze-Holding Construction In Progress?

Mostostal Zabrze-Holding FRA:V51 -0.28% 58 Construction In Progress is €0.0 Mil as of Mar. 2026. GuruFocus rates FRA:V51 with a GF Score™ of 58/100 and a GF Value™ of €1.11 (Modestly Overvalued). The stock has 9 warning signs investors should review.


Mostostal Zabrze-Holding Construction In Progress Historical Data

* Premium members only.

The historical data trend for Mostostal Zabrze-Holding's Construction In Progress can be seen below:

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

Mostostal Zabrze-Holding Construction In Progress Chart

Mostostal Zabrze-Holding Annual Data
Trend Dec15 Dec16 Dec17 Dec18 Dec19 Dec20 Dec21 Dec22 Dec23 Dec24
Construction In Progress
Get a 7-Day Free Trial Premium Member Only Premium Member Only 0.00 0.00 0.00 0.00 0.00

Mostostal Zabrze-Holding Quarterly Data
Mar21 Jun21 Sep21 Dec21 Mar22 Jun22 Sep22 Dec22 Mar23 Jun23 Sep23 Dec23 Mar24 Jun24 Sep24 Dec24 Mar25 Jun25 Sep25 Mar26
Construction In Progress Get a 7-Day Free Trial Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only 0.00 0.00 0.00 0.00 0.00
FRA:V51
58GF Score
Mostostal Zabrze-Holding SA FRA:V51
Construction In Progress is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Mostostal Zabrze-Holding Construction In Progress Calculation

It records the cost of construction work, which is not yet completed (typically, applied to capital budget items). A construction in progress item is not depreciated until the asset is placed in service. Normally, upon completion, a construction in progress item is reclassified, and the reclassified asset is capitalized and depreciated.

What does a Construction In Progress of €0.0 Mil mean?
Mostostal Zabrze-Holding (FRA:V51) has a Construction In Progress of €0.0 Mil as of Mar. 2026. Construction in Progress records the amount of construction work that is not complete. View historical data on Mostostal Zabrze-Holding and its competitors.
Is Mostostal Zabrze-Holding's Construction In Progress too high?
Mostostal Zabrze-Holding's current Construction In Progress is €0.0 Mil. Overall, Mostostal Zabrze-Holding has a GF Score™ of 58/100 and is considered Modestly Overvalued, reflecting its overall financial health beyond just this single metric.
How does Mostostal Zabrze-Holding's Construction In Progress compare to PWR and FIX?
Mostostal Zabrze-Holding's Construction In Progress of €0.0 Mil can be compared against companies in the Construction industry. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good Construction In Progress for a Construction company?
A good Construction In Progress depends on the Construction industry context. However, Construction In Progress should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high Construction In Progress mean?
A high Construction In Progress can signal that a stock is expensive relative to its fundamentals. Construction in Progress records the amount of construction work that is not complete. View historical data on Mostostal Zabrze-Holding and its competitors. Mostostal Zabrze-Holding's current Construction In Progress is €0.0 Mil. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is Mostostal Zabrze-Holding stock overvalued right now?
Based on GuruFocus' analysis, Mostostal Zabrze-Holding (FRA:V51) is currently considered Modestly Overvalued. The stock's GF Value™ is €1.11, compared to a current price of €1.42 — trading 27.6% above its estimated fair value. The current Construction In Progress is €0.0 Mil. Mostostal Zabrze-Holding's overall GF Score™ is 58/100 with 9 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is Construction In Progress calculated?
Construction In Progress is calculated from a company's financial statements. For Mostostal Zabrze-Holding (FRA:V51), the current Construction In Progress is €0.0 Mil as of Mar. 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is Mostostal Zabrze-Holding (FRA:V51) Overvalued in 2026?

Based on GuruFocus' analysis, Mostostal Zabrze-Holding stock appears to be overvalued. The current stock price of €1.42 is trading 27.6% above its estimated GF Value™ of €1.11. GuruFocus considers Mostostal Zabrze-Holding to be Modestly Overvalued.

Key valuation signals for FRA:V51:

  • Construction In Progress: €0.0 Mil
  • GF Value™: €1.11 vs. price of €1.42 (27.6% above fair value)
  • GF Score™: 58/100 with 9 warning signs

No single metric tells the full story. See the FRA:V51 stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


Mostostal Zabrze-Holding Business Description

Other Exchanges MSZ:Poland
Address Dubois Street 16, Gliwice, POL, 44-100
Mostostal Zabrze-Holding SA is a Poland based company engaged in the business activities of general contracting of industrial projects, including power and environmental protection facilities and installations as well as public utility and commercial buildings, and subcontracting of specialist works. The group offers a comprehensive range of works from design and engineering, civil works, earth- and roadworks, production, and erection of steel structure, delivery, and installation of piping to the installation of process equipment and mechanical plant.
58GF Score

Get the complete analysis for FRA:V51

Construction In Progress is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

€1.42
Price
€1.11
GF Value