Central Mine Planning & Design Institute (BOM:544739) EPS (Basic): ₹2.63 (TTM As of Mar. 2026)

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

BOM:544739 Central Mine Planning & Design Institute Ltd BOM:544739
21 GF Score
Price ₹271.40
! 5 Warning Signs
View Full Analysis

What is Central Mine Planning & Design Institute EPS (Basic)?

Central Mine Planning & Design Institute BOM:544739 +3.73% 21 EPS (Basic) is ₹2.63 as of Mar. 2026. GuruFocus rates BOM:544739 with a GF Score™ of 21/100. The stock has 5 warning signs investors should review.

Central Mine Planning & Design Institute's basic earnings per share (Basic EPS) for the three months ended in Mar. 2026 was ₹2.63. Its basic earnings per share (Basic EPS) for the trailing twelve months (TTM) ended in Mar. 2026 was ₹2.63.

Central Mine Planning & Design Institute's EPS (Diluted) for the three months ended in Mar. 2026 was ₹2.63. Its EPS (Diluted) for the trailing twelve months (TTM) ended in Mar. 2026 was ₹2.63.

Central Mine Planning & Design Institute's EPS without NRI for the three months ended in Mar. 2026 was ₹2.63. Its EPS without NRIearnings per share without non-recurring items for the trailing twelve months (TTM) ended in Mar. 2026 was 2.63.

During the past 12 months, Central Mine Planning & Design Institute's average EPS without NRIGrowth Rate was -8.00% per year. During the past 3 years, the average EPS without NRI Growth Rate was 27.40% per year. Please click Growth Rate Calculation Example (GuruFocus) to see how GuruFocus calculates Wal-Mart Stores Inc (WMT)'s revenue growth rate. You can apply the same method to get the EPS without NRI Growth Rate using EPS without NRI data.

During the past 4 years, Central Mine Planning & Design Institute's highest 3-Year average EPS without NRI Growth Rate was 27.40% per year. The lowest was 27.40% per year. And the median was 27.40% per year.


Central Mine Planning & Design Institute  (BOM:544739) EPS (Basic) Explanation

EPS is the single most important variable used by Wall Street in determining the earnings power of a company. But investors need to be aware that Earnings per Share can be easily manipulated by adjusting depreciation and amortization rate or non-recurring items. That's why GuruFocus lists EPS without NRI, which better reflects the company's underlying performance.


Be Aware

Compared with Earnings per share, a company's cash flow is better indicator of the company's earnings power.

If a company's earnings per share is less than cash flow per share over long term, investors need to be cautious and find out why.


Central Mine Planning & Design Institute EPS (Basic) Related Terms


Central Mine Planning & Design Institute EPS (Basic) Historical Data

* Premium members only.

The historical data trend for Central Mine Planning & Design Institute's EPS (Basic) can be seen below:

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

Central Mine Planning & Design Institute EPS (Basic) Chart

Central Mine Planning & Design Institute Annual Data
Trend Mar23 Mar24 Mar25 Mar26
EPS (Basic)
4.16 7.05 9.34 8.59

Central Mine Planning & Design Institute Quarterly Data
Mar23 Mar24 Mar25 Dec25 Mar26
EPS (Basic) 0.00 0.00 3.88 0.00 2.63
BOM:544739
21GF Score
Central Mine Planning & Design Institute Ltd BOM:544739
EPS (Basic) is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Central Mine Planning & Design Institute EPS (Basic) Calculation

EPS (Basic) is a rough measurement of the amount of a company's profit that can be allocated to one share of its stock. Basic earnings per share (EPS) do not factor in the dilutive effects on convertible securities.

Central Mine Planning & Design Institute's Basic EPS for the fiscal year that ended in Mar. 2026 is calculated as

Basic EPS (A: Mar. 2026 )=(Net Income-Preferred Dividends)/Shares Outstanding (Basic Average)
=(6131.8-0)/713.830
=8.59

Central Mine Planning & Design Institute's Basic EPS for the quarter that ended in Mar. 2026 is calculated as

Basic EPS (Q: Mar. 2026 )=(Net Income-Preferred Dividends)/Shares Outstanding (Basic Average)
=(1878.2-0)/714.144
=2.63

EPS (Basic) for the trailing twelve months (TTM) ended in Mar. 2026 adds up the quarterly data reported by the company within the most recent 12 months, which was ₹2.63

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

Frequently Asked Questions Learn more about EPS (Basic) →
What does a EPS (Basic) of ₹2.63 mean?
Central Mine Planning & Design Institute (BOM:544739) has a EPS (Basic) of ₹2.63 as of Mar. 2026. Earnings per share (basic) equals net income divided by the standard, non-diluted average shares outstanding. View historical data on Central Mine Planning & Design Institute and its competitors.
Is Central Mine Planning & Design Institute's EPS (Basic) too high?
Central Mine Planning & Design Institute's current EPS (Basic) is ₹2.63. Overall, Central Mine Planning & Design Institute has a GF Score™ of 21/100, reflecting its overall financial health beyond just this single metric.
How does Central Mine Planning & Design Institute's EPS (Basic) compare to competitors?
Central Mine Planning & Design Institute's EPS (Basic) of ₹2.63 can be compared against companies in the Metals & Mining industry. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good EPS (Basic) for a Metals & Mining company?
A good EPS (Basic) depends on the Metals & Mining industry context. However, EPS (Basic) should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high EPS (Basic) mean?
A high EPS (Basic) can signal that a stock is expensive relative to its fundamentals. Earnings per share (basic) equals net income divided by the standard, non-diluted average shares outstanding. View historical data on Central Mine Planning & Design Institute and its competitors. Central Mine Planning & Design Institute's current EPS (Basic) is ₹2.63. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is Central Mine Planning & Design Institute stock overvalued right now?
Central Mine Planning & Design Institute (BOM:544739) has a current EPS (Basic) of ₹2.63. The current EPS (Basic) is ₹2.63. Central Mine Planning & Design Institute's overall GF Score™ is 21/100 with 5 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is EPS (Basic) calculated?
EPS (Basic) is calculated from a company's financial statements. For Central Mine Planning & Design Institute (BOM:544739), the current EPS (Basic) is ₹2.63 as of Mar. 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Central Mine Planning & Design Institute Business Description

Other Exchanges CMPDI:India
Address Kanke Road, Gondwana Place, Ranchi, JH, IND, 834008
Central Mine Planning & Design Institute Ltd provides consultancy support in coal and mineral exploration including geological, geophysical, hydrological and environmental data generation. Its services also include infrastructure engineering, environmental management, geomatics, specialized technology services, and management systems, for the coal industry as well as for other minerals. The company's business operations include (i) geological exploration and resource evaluation; (ii) mine planning and design services; (iii) environment services; (iv) geomatics and survey services. The majority of revenue is derived from the Geological Exploration and Resource Evaluation services, which include services such as drilling and geological report preparation.
21GF Score

Get the complete analysis for BOM:544739

EPS (Basic) is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

₹271.40
Price