PLB Engineering Bhd (XKLS:7055) 3-Year ROIIC % : 8.39% (As of Aug. 2025) — 2231% Above Median

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

XKLS:7055 PLB Engineering Bhd XKLS:7055
43 GF Score
Price RM0.80
GF Value RM1.14
Valuation Possible Value Trap
! 4 Warning Signs
View Full Analysis

What is PLB Engineering Bhd 3-Year ROIIC %?

PLB Engineering Bhd XKLS:7055 43 3-Year ROIIC % is 8.39 as of Aug. 2025, which is 2231% above its 10-year median of 0.36. GuruFocus rates XKLS:7055 with a GF Score™ of 43/100 and a GF Value™ of RM1.14 (Possible Value Trap). The stock has 4 warning signs investors should review. Among 1,685 Construction companies, PLB Engineering Bhd ranks better than 57.86% on this metric.

3-Year Return on Invested Incremental Capital (3-Year ROIIC %) measures the change in earnings as a percentage of change in investment over 3-year. PLB Engineering Bhd's 3-Year ROIIC % for the quarter that ended in Aug. 2025 was 8.39%. High ROIIC is generally an indication that your business is capital efficient or has a higher operating leverage.

The industry rank for PLB Engineering Bhd's 3-Year ROIIC % or its related term are showing as below:

XKLS:7055's 3-Year ROIIC % is ranked better than
57.86% of 1685 companies
in the Construction industry
Industry Median: 4.63 vs XKLS:7055: 8.39

PLB Engineering Bhd  (XKLS:7055) 3-Year ROIIC % Explanation

Return on Incremental Invested Capital (ROIIC) is an extension of Return on Investment Capital (ROIC). ROIC % tells investors how efficiently that profitability is earned per dollar of company capital. ROIIC narrows the focus even further and shows how profitable each additional unit of capital investment could be. ROIIC % is a more powerful metric than ROIC because it measures how much money the company can generate going forward on future capital investments.

High ROIIC is generally an indication that your business is capital efficient or has a higher operating leverage.

Be Aware

It's important to keep in mind that when tracking ROIIC, the metric is better suited to forecasting the trend of future returns rather than measuring current return on investment.


PLB Engineering Bhd 3-Year ROIIC % Related Terms


PLB Engineering Bhd 3-Year ROIIC % Historical Data

* Premium members only.

The historical data trend for PLB Engineering Bhd's 3-Year ROIIC % can be seen below:

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

PLB Engineering Bhd 3-Year ROIIC % Chart

PLB Engineering Bhd Annual Data
Trend Aug16 Aug17 Aug18 Aug19 Aug20 Aug21 Aug22 Aug23 Aug24 Aug25
3-Year ROIIC %
Get a 7-Day Free Trial Premium Member Only Premium Member Only 8.86 -7.37 28.21 -3.35 8.39

PLB Engineering Bhd Quarterly Data
May21 Aug21 Nov21 Feb22 May22 Aug22 Nov22 Feb23 May23 Aug23 Nov23 Feb24 May24 Aug24 Nov24 Feb25 May25 Aug25 Nov25 Feb26
3-Year ROIIC % Get a 7-Day Free Trial Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only 0.00 0.00 8.39 0.00 0.00

XKLS:7055 vs PWR, FIX, EME: 3-Year ROIIC % Comparison

For the Engineering & Construction subindustry, PLB Engineering Bhd's 3-Year ROIIC %, along with its competitors' market caps and 3-Year ROIIC % data, can be viewed below:

* Competitive companies are chosen from companies within the same industry, with headquarter located in same country, with closest market capitalization; x-axis shows the market cap, and y-axis shows the term value; the bigger the dot, the larger the market cap. Note that "N/A" values will not show up in the chart.


PLB Engineering Bhd 3-Year ROIIC % vs Construction Industry

For the Construction industry and Industrials sector, PLB Engineering Bhd's 3-Year ROIIC % distribution charts can be found below:

* The bar in red indicates where PLB Engineering Bhd's 3-Year ROIIC % falls into.


XKLS:7055
43GF Score
PLB Engineering Bhd XKLS:7055
3-Year ROIIC % is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

PLB Engineering Bhd 3-Year ROIIC % Calculation

PLB Engineering Bhd's 3-Year ROIIC % for the quarter that ended in Aug. 2025 is calculated as:

3-Year ROIIC %=3-Year Incremental Net Operating Profit After Taxes (NOPAT)**/3-Year Incremental Invested Capital**
=( 2.0666936 (Aug. 2025) - 17.2580276 (Aug. 2022) )/( 221.256 (Aug. 2025) - 402.329 (Aug. 2022) )
=-15.191334/-181.073
=8.39%***

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

** Annual data of NOPAT and Invested Capital was used to calculate 3-Year ROIIC %.
*** Please be aware that the ROIIC (Return on Invested Capital) calculations are based on company-level data using the primary share class. The calculated data provided is for demonstration purposes and may slightly differ from the results displayed in the title due to potential variations caused by currency exchange rate differences throughout the year.

Frequently Asked Questions Learn more about 3-Year ROIIC % →
What does a 3-Year ROIIC % of 8.39 mean?
PLB Engineering Bhd (XKLS:7055) has a 3-Year ROIIC % of 8.39 as of Aug. 2025. 3-Year ROIIC % measures the change in earnings as a percentage of change in investment over 3-year. View historical data on PLB Engineering Bhd and its competitors. This is 2231% above median its historical median of 0.36. According to the industry distribution chart, PLB Engineering Bhd ranks #710 out of 1685 companies in the Construction industry, placing it in the top 42.1%.
Is PLB Engineering Bhd's 3-Year ROIIC % too high?
PLB Engineering Bhd's current 3-Year ROIIC % of 8.39 is 2231% above median its 10-year median of 0.36. The Construction industry median 3-Year ROIIC % is 4.63. PLB Engineering Bhd's value of 8.39 is 81.2% above this industry median. Based on the distribution chart, PLB Engineering Bhd ranks #710 out of 1685 companies in the Construction industry, which is above the industry midpoint. Overall, PLB Engineering Bhd has a GF Score™ of 43/100 and is considered Possible Value Trap, reflecting its overall financial health beyond just this single metric.
How does PLB Engineering Bhd's 3-Year ROIIC % compare to PWR and FIX?
According to the Construction industry distribution chart, PLB Engineering Bhd ranks #710 out of 1685 companies for 3-Year ROIIC %. This puts PLB Engineering Bhd in the upper half of its industry. The industry median 3-Year ROIIC % is 4.63. PLB Engineering Bhd's value of 8.39 is 81.2% above this benchmark. While the company's 10-year median is 0.36 vs. the industry median of 4.63, PLB Engineering Bhd has consistently been above the industry average. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good 3-Year ROIIC % for a Construction company?
The median 3-Year ROIIC % among Construction companies is 4.63, based on 1,685 companies in the industry. Companies in the top quartile (top 25%) have a 3-Year ROIIC % significantly above this median, while those in the bottom quartile fall well below. However, 3-Year ROIIC % should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. PLB Engineering Bhd's current 3-Year ROIIC % of 8.39 is 81.2% above the industry median. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high 3-Year ROIIC % mean?
A high 3-Year ROIIC % can signal that a stock is expensive relative to its fundamentals. 3-Year ROIIC % measures the change in earnings as a percentage of change in investment over 3-year. View historical data on PLB Engineering Bhd and its competitors. For the Construction industry, the median 3-Year ROIIC % is 4.63 — values significantly above this may indicate overvaluation, while values below may suggest a bargain or underlying issues. PLB Engineering Bhd's current 3-Year ROIIC % is 8.39, which is 2231% above median its own 10-year median of 0.36. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is PLB Engineering Bhd stock overvalued right now?
Based on GuruFocus' analysis, PLB Engineering Bhd (XKLS:7055) is currently considered Possible Value Trap. The stock's GF Value™ is RM1.14, compared to a current price of RM0.80 — trading 29.8% below its estimated fair value. The current 3-Year ROIIC % is 8.39, which is 2231% above median its 10-year median of 0.36 and 81.2% above the Construction industry median of 4.63. PLB Engineering Bhd's overall GF Score™ is 43/100 with 4 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is 3-Year ROIIC % calculated?
3-Year ROIIC % is calculated from a company's financial statements. For PLB Engineering Bhd (XKLS:7055), the current 3-Year ROIIC % is 8.39 as of Aug. 2025. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is PLB Engineering Bhd (XKLS:7055) Overvalued in 2026?

Based on GuruFocus' analysis, PLB Engineering Bhd stock appears to be undervalued. The current stock price of RM0.80 is trading 29.8% below its estimated GF Value™ of RM1.14. GuruFocus considers PLB Engineering Bhd to be Possible Value Trap.

Key valuation signals for XKLS:7055:

  • 3-Year ROIIC %: 8.39 (2231% above median its 10-year median of 0.36)
  • GF Value™: RM1.14 vs. price of RM0.80 (29.8% below fair value)
  • GF Score™: 43/100 with 4 warning signs
  • Industry Position: 81.2% above the Construction median (#710 of 1685)

No single metric tells the full story. See the XKLS:7055 stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


PLB Engineering Bhd Business Description

Address 1320, Jalan Baru, Taman Chai Leng, Perai, PNG, MYS, 13700
PLB Engineering Bhd is a Malaysia-based firm engaged in property development, construction, and related services. The company operates in four segments: Construction, which involves the construction of industrial, residential, and commercial buildings and renovation work; Property development, which comprises housing and property development; Investment holding, which includes investment holding and property letting; and the Solar energy segment, which comprises the generation of electricity from the solar plant. The majority of its revenue comes from the Construction Segment.
43GF Score

Get the complete analysis for XKLS:7055

3-Year ROIIC % is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

RM0.80
Price
RM1.14
GF Value