CBH Engineering Holding Bhd (XKLS:0339) 5-Year Yield-on-Cost %: 0.38 (As of Jul. 24, 2026) — 21% Below Median

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

XKLS:0339 CBH Engineering Holding Bhd XKLS:0339
21 GF Score
Price RM0.69
! 3 Warning Signs
View Full Analysis

What is CBH Engineering Holding Bhd 5-Year Yield-on-Cost %?

CBH Engineering Holding Bhd XKLS:0339 -0.72% 21 5-Year Yield-on-Cost % is 0.38 as of Jul. 24, 2026, which is 21% below its 10-year median of 0.48. GuruFocus rates XKLS:0339 with a GF Score™ of 21/100. The stock has 3 warning signs investors should review. Among 1,013 Construction companies, CBH Engineering Holding Bhd ranks worse than 92.89% on this metric.

CBH Engineering Holding Bhd's yield on cost for the quarter that ended in Mar. 2026 was 0.38.


The historical rank and industry rank for CBH Engineering Holding Bhd's 5-Year Yield-on-Cost % or its related term are showing as below:

XKLS:0339' s 5-Year Yield-on-Cost % Range Over the Past 10 Years
Min: 0.38   Med: 0.48   Max: 0.6
Current: 0.38


During the past 5 years, CBH Engineering Holding Bhd's highest Yield on Cost was 0.60. The lowest was 0.38. And the median was 0.48.


XKLS:0339's 5-Year Yield-on-Cost % is ranked worse than
92.89% of 1013 companies
in the Construction industry
Industry Median: 3.44 vs XKLS:0339: 0.38

CBH Engineering Holding Bhd  (XKLS:0339) 5-Year Yield-on-Cost % Explanation

Of course the risk here is that the company may not raise its dividends as it did before. The key is to select the companies that can consistently raise its dividends. Usually companies with long history of raising dividends tend to do so.


CBH Engineering Holding Bhd 5-Year Yield-on-Cost % Related Terms


XKLS:0339 vs PWR, FIX, EME: 5-Year Yield-on-Cost % Comparison

For the Engineering & Construction subindustry, CBH Engineering Holding Bhd's 5-Year Yield-on-Cost %, along with its competitors' market caps and 5-Year Yield-on-Cost % data, can be viewed below:

* Competitive companies are chosen from companies within the same industry, with headquarter located in same country, with closest market capitalization; x-axis shows the market cap, and y-axis shows the term value; the bigger the dot, the larger the market cap. Note that "N/A" values will not show up in the chart.


CBH Engineering Holding Bhd 5-Year Yield-on-Cost % vs Construction Industry

For the Construction industry and Industrials sector, CBH Engineering Holding Bhd's 5-Year Yield-on-Cost % distribution charts can be found below:

* The bar in red indicates where CBH Engineering Holding Bhd's 5-Year Yield-on-Cost % falls into.


XKLS:0339
21GF Score
CBH Engineering Holding Bhd XKLS:0339
5-Year Yield-on-Cost % is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

CBH Engineering Holding Bhd 5-Year Yield-on-Cost % Calculation

Dividend Yield % and dividend growth of a stock is an important factor for income investors. But if company A raises its dividend constantly faster than company B, company A's future dividend yield might be much higher than Company B's even if their yields are the same now and their stock prices do not change.

Yield on Cost assumes that you buy and the stock today, and hold it for 5 years. If the company raises it dividends at the same rate as it did over the past 5 years, the dividends investors receive annually in 5 years relative to the stock price today.

Therefore, Yield-on-Cost of CBH Engineering Holding Bhd is calculated as

Yield-on-Cost=Dividend Yield %*(1+Dividend Growth Rate)^5
Frequently Asked Questions Learn more about 5-Year Yield-on-Cost % →
What does a 5-Year Yield-on-Cost % of 0.38 mean?
CBH Engineering Holding Bhd (XKLS:0339) has a 5-Year Yield-on-Cost % of 0.38 as of Jul. 24, 2026. 5-Year Yield on Cost measures the expected yield based on a company's current yield and 5-year dividend growth. View historical data on CBH Engineering Holding Bhd and its competitors. This is 21% below median its historical median of 0.48. Over the past decade, CBH Engineering Holding Bhd's 5-Year Yield-on-Cost % has ranged from 0.38 to 0.60. According to the industry distribution chart, CBH Engineering Holding Bhd ranks #941 out of 1013 companies in the Construction industry, placing it in the top 92.9%.
Is CBH Engineering Holding Bhd's 5-Year Yield-on-Cost % too high?
CBH Engineering Holding Bhd's current 5-Year Yield-on-Cost % of 0.38 is 21% below median its 10-year median of 0.48. Over the past 10 years, this metric has ranged from a low of 0.38 to a high of 0.60. The Construction industry median 5-Year Yield-on-Cost % is 3.44. CBH Engineering Holding Bhd's value of 0.38 is 89% below this industry median. Based on the distribution chart, CBH Engineering Holding Bhd ranks #941 out of 1013 companies in the Construction industry, which is in the bottom quartile relative to peers. Overall, CBH Engineering Holding Bhd has a GF Score™ of 21/100, reflecting its overall financial health beyond just this single metric.
How does CBH Engineering Holding Bhd's 5-Year Yield-on-Cost % compare to PWR and FIX?
According to the Construction industry distribution chart, CBH Engineering Holding Bhd ranks #941 out of 1013 companies for 5-Year Yield-on-Cost %. This places CBH Engineering Holding Bhd in the lower half of its industry. The industry median 5-Year Yield-on-Cost % is 3.44. CBH Engineering Holding Bhd's value of 0.38 is 89% below this benchmark. Historically, CBH Engineering Holding Bhd's own 5-Year Yield-on-Cost % has ranged from 0.38 to 0.60 over the past decade. While the company's 10-year median is 0.48 vs. the industry median of 3.44, CBH Engineering Holding Bhd has consistently been below the industry average. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good 5-Year Yield-on-Cost % for a Construction company?
The median 5-Year Yield-on-Cost % among Construction companies is 3.44, based on 1,013 companies in the industry. Companies in the top quartile (top 25%) have a 5-Year Yield-on-Cost % significantly above this median, while those in the bottom quartile fall well below. However, 5-Year Yield-on-Cost % should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. CBH Engineering Holding Bhd's current 5-Year Yield-on-Cost % of 0.38 is 89% below the industry median. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high 5-Year Yield-on-Cost % mean?
A high 5-Year Yield-on-Cost % can signal that a stock is expensive relative to its fundamentals. 5-Year Yield on Cost measures the expected yield based on a company's current yield and 5-year dividend growth. View historical data on CBH Engineering Holding Bhd and its competitors. For the Construction industry, the median 5-Year Yield-on-Cost % is 3.44 — values significantly above this may indicate overvaluation, while values below may suggest a bargain or underlying issues. CBH Engineering Holding Bhd's current 5-Year Yield-on-Cost % is 0.38, which is 21% below median its own 10-year median of 0.48. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is CBH Engineering Holding Bhd stock overvalued right now?
CBH Engineering Holding Bhd (XKLS:0339) has a current 5-Year Yield-on-Cost % of 0.38. The current 5-Year Yield-on-Cost % is 0.38, which is 21% below median its 10-year median of 0.48 and 89% below the Construction industry median of 3.44. CBH Engineering Holding Bhd's overall GF Score™ is 21/100 with 3 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is 5-Year Yield-on-Cost % calculated?
5-Year Yield-on-Cost % is calculated from a company's financial statements. For CBH Engineering Holding Bhd (XKLS:0339), the current 5-Year Yield-on-Cost % is 0.38 as of Jul. 24, 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

CBH Engineering Holding Bhd Business Description

Address Jalan Anggerik Vanilla AD 31/AD, 12, 12A, 12B, 14, 14A & 14B, Kota Kemuning, Shah Alam, SGR, MYS, 40460
CBH Engineering Holding Bhd is an investment holding company. Through its subsidiaries, it is principally an electrical engineering service provider and it specializes in electricity supply distribution systems, where the company undertakes the design, supply, installation, testing, commissioning and maintenance of HV, MV, LV and ELV electrical systems. It also undertakes mechanical engineering works for building systems, where this relates to the design, supply, installation, testing, commissioning and maintenance of building systems such as ACMV systems, fire protection systems, plumbing and sanitary systems as well as renewable energy systems.
21GF Score

Get the complete analysis for XKLS:0339

5-Year Yield-on-Cost % is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

RM0.69
Price