PT Pratama Widya Tbk (ISX:PTPW) Altman Z-Score


ISX:PTPW PT Pratama Widya Tbk ISX:PTPW
17 GF Score
Price Rp1,250.00
! 1 Warning Sign
View Full Analysis

What is PT Pratama Widya Tbk Altman Z-Score?

The Altman Z-Score is a model designed to predict the likelihood of a company going bankrupt within the next two years. Created by American finance professor Edward Altman in 1968, the model is specifically designed for publicly traded manufacturing companies with assets greater than $1 million.

PT Pratama Widya Tbk does not have enough data to calculate Altman Z-Score.


PT Pratama Widya Tbk  (ISX:PTPW) Altman Z-Score Explanation

X1: The Working Capital/Total Assets (WC/TA) ratio is a measure of the net liquid assets of the firm relative to the total capitalization. Working capital is defined as the difference between current assets and current liabilities. Ordinarily, a firm experiencing consistent operating losses will have shrinking current assets in relation to total assets. Altman found this one proved to be the most valuable liquidity ratio comparing with the current ratio and the quick ratio. This is however the least significant of the five factors.

X2: Retained Earnings/Total Assets: the RE/TA ratio measures the leverage of a firm. Retained earnings is the account which reports the total amount of reinvested earnings and/or losses of a firm over its entire life. Those firms with high RE, relative to TA, have financed their assets through retention of profits and have not utilized as much debt.

X3, Earnings Before Interest and Taxes/Total Assets (EBIT/TA): This ratio is a measure of the true productivity of the firm's assets, independent of any tax or leverage factors. Since a firm's ultimate existence is based on the earning power of its assets, this ratio appears to be particularly appropriate for studies dealing with corporate failure. This ratio continually outperforms other profitability measures, including cash flow.

X4, Market Value of Equity/Book Value of Total Liabilities (MVE/TL): The measure shows how much the firm's assets can decline in value (measured by market value of equity plus debt) before the liabilities exceed the assets and the firm becomes insolvent.

X5, Revenue/Total Assets (S/TA): The capital-turnover ratio is a standard financial ratio illustrating the sales generating ability of the firm's assets.

Read more about Altman Z-Score and the original research.


Be Aware

Altman Z-Score does not apply to financial companies.


PT Pratama Widya Tbk Altman Z-Score Related Terms


PT Pratama Widya Tbk Altman Z-Score Historical Data

* Premium members only.

The historical data trend for PT Pratama Widya Tbk's Altman Z-Score can be seen below:

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

PT Pratama Widya Tbk Altman Z-Score Chart

PT Pratama Widya Tbk Annual Data
Trend
Altman Z-Score

PT Pratama Widya Tbk Semi-Annual Data
Altman Z-Score

ISX:PTPW vs PWR, FIX, EME: Altman Z-Score Comparison

For the Engineering & Construction subindustry, PT Pratama Widya Tbk's Altman Z-Score, along with its competitors' market caps and Altman Z-Score data, can be viewed below:

* Competitive companies are chosen from companies within the same industry, with headquarter located in same country, with closest market capitalization; x-axis shows the market cap, and y-axis shows the term value; the bigger the dot, the larger the market cap. Note that "N/A" values will not show up in the chart.


PT Pratama Widya Tbk Altman Z-Score vs Construction Industry

For the Construction industry and Industrials sector, PT Pratama Widya Tbk's Altman Z-Score distribution charts can be found below:

* The bar in red indicates where PT Pratama Widya Tbk's Altman Z-Score falls into.


ISX:PTPW
17GF Score
PT Pratama Widya Tbk ISX:PTPW
Altman Z-Score is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

PT Pratama Widya Tbk Business Description

Address Jalan Kepala Buaran PLN No.92 A-D, Widya Griya, Cikokol, Tangerang, Banten, IDN, 15117
PT Pratama Widya Tbk is engaged in specialist construction services that focus on foundation and ground improvement engineering services and geotechnical engineering. Its construction works include deep foundation (bored pile, piling, injection pile), retaining wall (soldier pile, sheet pile, secant pile, diaphragm wall), grouting and soil improvement (jet grouting, deep mixing, soil cement), slope reinforcement (soil nailing, ground anchor, rock bolt), dewatering, and other ground engineering works. Its services include Geotechnical Investigation, Foundation, Retaining Wall, Grouting & Soil Improvements, Slope Reinforcement & Dewatering, and Ground Engineering Solution. The Group's business operations are all in Indonesia.
17GF Score

Get the complete analysis for ISX:PTPW

Altman Z-Score is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

Rp1,250.00
Price