Ashoka Buildcon (BOM:533271) 5-Year Yield-on-Cost %: 0.00 (As of Jul. 06, 2026)


BOM:533271 Ashoka Buildcon Ltd BOM:533271
84 GF Score
Price ₹132.20
GF Value ₹150.50
Valuation Modestly Undervalued
! 7 Warning Signs
View Full Analysis

What is Ashoka Buildcon 5-Year Yield-on-Cost %?

Ashoka Buildcon BOM:533271 -0.15% 84 5-Year Yield-on-Cost % is 0.00 as of Jul. 06, 2026. GuruFocus rates BOM:533271 with a GF Score™ of 84/100 and a GF Value™ of ₹150.50 (Modestly Undervalued). The stock has 7 warning signs investors should review. Among 1,015 Construction companies, Ashoka Buildcon ranks worse than 98522.07% on this metric.

Ashoka Buildcon's yield on cost for the quarter that ended in Mar. 2026 was 0.00.


The historical rank and industry rank for Ashoka Buildcon's 5-Year Yield-on-Cost % or its related term are showing as below:


During the past 13 years, Ashoka Buildcon's highest Yield on Cost was 1.60. The lowest was 0.78. And the median was 1.15.


BOM:533271's 5-Year Yield-on-Cost % is not ranked *
in the Construction industry.
Industry Median: 3.34
* Ranked among companies with meaningful 5-Year Yield-on-Cost % only.

Ashoka Buildcon  (BOM:533271) 5-Year Yield-on-Cost % Explanation

Of course the risk here is that the company may not raise its dividends as it did before. The key is to select the companies that can consistently raise its dividends. Usually companies with long history of raising dividends tend to do so.


Ashoka Buildcon 5-Year Yield-on-Cost % Related Terms


BOM:533271 vs PWR, FIX, EME: 5-Year Yield-on-Cost % Comparison

For the Engineering & Construction subindustry, Ashoka Buildcon's 5-Year Yield-on-Cost %, along with its competitors' market caps and 5-Year Yield-on-Cost % data, can be viewed below:

* Competitive companies are chosen from companies within the same industry, with headquarter located in same country, with closest market capitalization; x-axis shows the market cap, and y-axis shows the term value; the bigger the dot, the larger the market cap. Note that "N/A" values will not show up in the chart.


Ashoka Buildcon 5-Year Yield-on-Cost % vs Construction Industry

For the Construction industry and Industrials sector, Ashoka Buildcon's 5-Year Yield-on-Cost % distribution charts can be found below:

* The bar in red indicates where Ashoka Buildcon's 5-Year Yield-on-Cost % falls into.


BOM:533271
84GF Score
Ashoka Buildcon Ltd BOM:533271
5-Year Yield-on-Cost % is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Ashoka Buildcon 5-Year Yield-on-Cost % Calculation

Dividend Yield % and dividend growth of a stock is an important factor for income investors. But if company A raises its dividend constantly faster than company B, company A's future dividend yield might be much higher than Company B's even if their yields are the same now and their stock prices do not change.

Yield on Cost assumes that you buy and the stock today, and hold it for 5 years. If the company raises it dividends at the same rate as it did over the past 5 years, the dividends investors receive annually in 5 years relative to the stock price today.

Therefore, Yield-on-Cost of Ashoka Buildcon is calculated as

Yield-on-Cost=Dividend Yield %*(1+Dividend Growth Rate)^5
Frequently Asked Questions Learn more about 5-Year Yield-on-Cost % →
What does a 5-Year Yield-on-Cost % of 0.00 mean?
Ashoka Buildcon (BOM:533271) has a 5-Year Yield-on-Cost % of 0.00 as of Jul. 06, 2026. 5-Year Yield on Cost measures the expected yield based on a company's current yield and 5-year dividend growth. View historical data on Ashoka Buildcon and its competitors. Over the past decade, Ashoka Buildcon's 5-Year Yield-on-Cost % has ranged from 0.78 to 1.60. According to the industry distribution chart, Ashoka Buildcon ranks #999999 out of 1015 companies in the Construction industry.
Is Ashoka Buildcon's 5-Year Yield-on-Cost % too high?
Ashoka Buildcon's current 5-Year Yield-on-Cost % is 0.00. Over the past 10 years, this metric has ranged from a low of 0.78 to a high of 1.60. Based on the distribution chart, Ashoka Buildcon ranks #999999 out of 1015 companies in the Construction industry, which is in the bottom quartile relative to peers. Overall, Ashoka Buildcon has a GF Score™ of 84/100 and is considered Modestly Undervalued, reflecting its overall financial health beyond just this single metric.
How does Ashoka Buildcon's 5-Year Yield-on-Cost % compare to PWR and FIX?
According to the Construction industry distribution chart, Ashoka Buildcon ranks #999999 out of 1015 companies for 5-Year Yield-on-Cost %. This places Ashoka Buildcon in the lower half of its industry. The industry median 5-Year Yield-on-Cost % is 3.34. Historically, Ashoka Buildcon's own 5-Year Yield-on-Cost % has ranged from 0.78 to 1.60 over the past decade. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good 5-Year Yield-on-Cost % for a Construction company?
The median 5-Year Yield-on-Cost % among Construction companies is 3.34, based on 1,015 companies in the industry. Companies in the top quartile (top 25%) have a 5-Year Yield-on-Cost % significantly above this median, while those in the bottom quartile fall well below. However, 5-Year Yield-on-Cost % should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high 5-Year Yield-on-Cost % mean?
A high 5-Year Yield-on-Cost % can signal that a stock is expensive relative to its fundamentals. 5-Year Yield on Cost measures the expected yield based on a company's current yield and 5-year dividend growth. View historical data on Ashoka Buildcon and its competitors. For the Construction industry, the median 5-Year Yield-on-Cost % is 3.34 — values significantly above this may indicate overvaluation, while values below may suggest a bargain or underlying issues. Ashoka Buildcon's current 5-Year Yield-on-Cost % is 0.00. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is Ashoka Buildcon stock overvalued right now?
Based on GuruFocus' analysis, Ashoka Buildcon (BOM:533271) is currently considered Modestly Undervalued. The stock's GF Value™ is ₹150.50, compared to a current price of ₹132.20 — trading 12.2% below its estimated fair value. The current 5-Year Yield-on-Cost % is 0.00. Ashoka Buildcon's overall GF Score™ is 84/100 with 7 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is 5-Year Yield-on-Cost % calculated?
5-Year Yield-on-Cost % is calculated from a company's financial statements. For Ashoka Buildcon (BOM:533271), the current 5-Year Yield-on-Cost % is 0.00 as of Jul. 06, 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is Ashoka Buildcon (BOM:533271) Overvalued in 2026?

Based on GuruFocus' analysis, Ashoka Buildcon stock appears to be undervalued. The current stock price of ₹132.20 is trading 12.2% below its estimated GF Value™ of ₹150.50. GuruFocus considers Ashoka Buildcon to be Modestly Undervalued.

Key valuation signals for BOM:533271:

  • 5-Year Yield-on-Cost %: 0.00
  • GF Value™: ₹150.50 vs. price of ₹132.20 (12.2% below fair value)
  • GF Score™: 84/100 with 7 warning signs

No single metric tells the full story. See the BOM:533271 stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


Ashoka Buildcon Business Description

Other Exchanges ASHOKA:India
Address Ashoka Marg, Survey No 861, Ashoka House, Vadala, Nashik, MH, IND, 422011
Ashoka Buildcon Ltd develops highways and is also active in power transmission and distribution. It operates in three segments: Construction and Contract Related Activities, which includes engineering, procurement, and construction of infrastructure projects; Build, Operate, and Transfer, which involves annuity-based infrastructure development under BOT and annuity models; and Sale of Goods, which mainly consists of the sale of construction materials, including RMC and real estate. The company operates across India, with the majority of its revenue generated from construction and contract-related activities.
84GF Score

Get the complete analysis for BOM:533271

5-Year Yield-on-Cost % is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

₹132.20
Price
₹150.50
GF Value