AME Elite Consortium Bhd (XKLS:5293) 5-Year Yield-on-Cost %: 23.23 (As of Jul. 18, 2026) — 167% Above Median

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

XKLS:5293 AME Elite Consortium Bhd XKLS:5293
93 GF Score
Price RM1.40
GF Value RM2.30
Valuation Significantly Undervalued
! 3 Warning Signs
View Full Analysis

What is AME Elite Consortium Bhd 5-Year Yield-on-Cost %?

AME Elite Consortium Bhd XKLS:5293 93 5-Year Yield-on-Cost % is 23.23 as of Jul. 18, 2026, which is 167% above its 10-year median of 8.71. GuruFocus rates XKLS:5293 with a GF Score™ of 93/100 and a GF Value™ of RM2.30 (Significantly Undervalued). The stock has 3 warning signs investors should review. Among 1,014 Construction companies, AME Elite Consortium Bhd ranks better than 96.25% on this metric.

AME Elite Consortium Bhd's yield on cost for the quarter that ended in Mar. 2026 was 23.23.


The historical rank and industry rank for AME Elite Consortium Bhd's 5-Year Yield-on-Cost % or its related term are showing as below:

XKLS:5293' s 5-Year Yield-on-Cost % Range Over the Past 10 Years
Min: 4.6   Med: 8.71   Max: 23.6
Current: 23.23


During the past 11 years, AME Elite Consortium Bhd's highest Yield on Cost was 23.60. The lowest was 4.60. And the median was 8.71.


XKLS:5293's 5-Year Yield-on-Cost % is ranked better than
96.25% of 1014 companies
in the Construction industry
Industry Median: 3.51 vs XKLS:5293: 23.23

AME Elite Consortium Bhd  (XKLS:5293) 5-Year Yield-on-Cost % Explanation

Of course the risk here is that the company may not raise its dividends as it did before. The key is to select the companies that can consistently raise its dividends. Usually companies with long history of raising dividends tend to do so.


AME Elite Consortium Bhd 5-Year Yield-on-Cost % Related Terms


XKLS:5293 vs PWR, FIX, EME: 5-Year Yield-on-Cost % Comparison

For the Engineering & Construction subindustry, AME Elite Consortium Bhd's 5-Year Yield-on-Cost %, along with its competitors' market caps and 5-Year Yield-on-Cost % data, can be viewed below:

* Competitive companies are chosen from companies within the same industry, with headquarter located in same country, with closest market capitalization; x-axis shows the market cap, and y-axis shows the term value; the bigger the dot, the larger the market cap. Note that "N/A" values will not show up in the chart.


AME Elite Consortium Bhd 5-Year Yield-on-Cost % vs Construction Industry

For the Construction industry and Industrials sector, AME Elite Consortium Bhd's 5-Year Yield-on-Cost % distribution charts can be found below:

* The bar in red indicates where AME Elite Consortium Bhd's 5-Year Yield-on-Cost % falls into.


XKLS:5293
93GF Score
AME Elite Consortium Bhd XKLS:5293
5-Year Yield-on-Cost % is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

AME Elite Consortium Bhd 5-Year Yield-on-Cost % Calculation

Dividend Yield % and dividend growth of a stock is an important factor for income investors. But if company A raises its dividend constantly faster than company B, company A's future dividend yield might be much higher than Company B's even if their yields are the same now and their stock prices do not change.

Yield on Cost assumes that you buy and the stock today, and hold it for 5 years. If the company raises it dividends at the same rate as it did over the past 5 years, the dividends investors receive annually in 5 years relative to the stock price today.

Therefore, Yield-on-Cost of AME Elite Consortium Bhd is calculated as

Yield-on-Cost=Dividend Yield %*(1+Dividend Growth Rate)^5
Frequently Asked Questions Learn more about 5-Year Yield-on-Cost % →
What does a 5-Year Yield-on-Cost % of 23.23 mean?
AME Elite Consortium Bhd (XKLS:5293) has a 5-Year Yield-on-Cost % of 23.23 as of Jul. 18, 2026. 5-Year Yield on Cost measures the expected yield based on a company's current yield and 5-year dividend growth. View historical data on AME Elite Consortium Bhd and its competitors. This is 167% above median its historical median of 8.71. Over the past decade, AME Elite Consortium Bhd's 5-Year Yield-on-Cost % has ranged from 4.60 to 23.60. According to the industry distribution chart, AME Elite Consortium Bhd ranks #38 out of 1014 companies in the Construction industry, placing it in the top 3.7%.
Is AME Elite Consortium Bhd's 5-Year Yield-on-Cost % too high?
AME Elite Consortium Bhd's current 5-Year Yield-on-Cost % of 23.23 is 167% above median its 10-year median of 8.71. Over the past 10 years, this metric has ranged from a low of 4.60 to a high of 23.60. The Construction industry median 5-Year Yield-on-Cost % is 3.51. AME Elite Consortium Bhd's value of 23.23 is 561.8% above this industry median. Based on the distribution chart, AME Elite Consortium Bhd ranks #38 out of 1014 companies in the Construction industry, which is in the top quartile — a strong position relative to peers. Overall, AME Elite Consortium Bhd has a GF Score™ of 93/100 and is considered Significantly Undervalued, reflecting its overall financial health beyond just this single metric.
How does AME Elite Consortium Bhd's 5-Year Yield-on-Cost % compare to PWR and FIX?
According to the Construction industry distribution chart, AME Elite Consortium Bhd ranks #38 out of 1014 companies for 5-Year Yield-on-Cost %. This places AME Elite Consortium Bhd in the top 4% of its industry — outperforming the majority of peers. The industry median 5-Year Yield-on-Cost % is 3.51. AME Elite Consortium Bhd's value of 23.23 is 561.8% above this benchmark. Historically, AME Elite Consortium Bhd's own 5-Year Yield-on-Cost % has ranged from 4.60 to 23.60 over the past decade. While the company's 10-year median is 8.71 vs. the industry median of 3.51, AME Elite Consortium Bhd has consistently been above the industry average. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good 5-Year Yield-on-Cost % for a Construction company?
The median 5-Year Yield-on-Cost % among Construction companies is 3.51, based on 1,014 companies in the industry. Companies in the top quartile (top 25%) have a 5-Year Yield-on-Cost % significantly above this median, while those in the bottom quartile fall well below. However, 5-Year Yield-on-Cost % should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. AME Elite Consortium Bhd's current 5-Year Yield-on-Cost % of 23.23 is 561.8% above the industry median. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high 5-Year Yield-on-Cost % mean?
A high 5-Year Yield-on-Cost % can signal that a stock is expensive relative to its fundamentals. 5-Year Yield on Cost measures the expected yield based on a company's current yield and 5-year dividend growth. View historical data on AME Elite Consortium Bhd and its competitors. For the Construction industry, the median 5-Year Yield-on-Cost % is 3.51 — values significantly above this may indicate overvaluation, while values below may suggest a bargain or underlying issues. AME Elite Consortium Bhd's current 5-Year Yield-on-Cost % is 23.23, which is 167% above median its own 10-year median of 8.71. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is AME Elite Consortium Bhd stock overvalued right now?
Based on GuruFocus' analysis, AME Elite Consortium Bhd (XKLS:5293) is currently considered Significantly Undervalued. The stock's GF Value™ is RM2.30, compared to a current price of RM1.40 — trading 39.1% below its estimated fair value. The current 5-Year Yield-on-Cost % is 23.23, which is 167% above median its 10-year median of 8.71 and 561.8% above the Construction industry median of 3.51. AME Elite Consortium Bhd's overall GF Score™ is 93/100 with 3 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is 5-Year Yield-on-Cost % calculated?
5-Year Yield-on-Cost % is calculated from a company's financial statements. For AME Elite Consortium Bhd (XKLS:5293), the current 5-Year Yield-on-Cost % is 23.23 as of Jul. 18, 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is AME Elite Consortium Bhd (XKLS:5293) Overvalued in 2026?

Based on GuruFocus' analysis, AME Elite Consortium Bhd stock appears to be undervalued. The current stock price of RM1.40 is trading 39.1% below its estimated GF Value™ of RM2.30. GuruFocus considers AME Elite Consortium Bhd to be Significantly Undervalued.

Key valuation signals for XKLS:5293:

  • 5-Year Yield-on-Cost %: 23.23 (167% above median its 10-year median of 8.71)
  • GF Value™: RM2.30 vs. price of RM1.40 (39.1% below fair value)
  • GF Score™: 93/100 with 3 warning signs
  • Industry Position: 561.8% above the Construction median (#38 of 1014)

No single metric tells the full story. See the XKLS:5293 stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


AME Elite Consortium Bhd Business Description

Address No. 2, Jalan I-Park SAC 1/1, Taman Perindustrian I-Park SAC, Senai, JHR, MYS, 81400
AME Elite Consortium Bhd is an investment holding company. It specializes in the development of industrial parks and the construction of large-scale manufacturing plants. The company's operating segment includes Construction, Property development, Engineering, and Investment holding/property investment and management services. Geographically, the company operates in Malaysia.
93GF Score

Get the complete analysis for XKLS:5293

5-Year Yield-on-Cost % is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

RM1.40
Price
RM2.30
GF Value