Asia Metal PCL (BKK:AMC) Construction In Progress: ฿0 Mil (As of Mar. 2026)

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

BKK:AMC Asia Metal PCL BKK:AMC
68 GF Score
Price ฿2.08
GF Value ฿2.18
Valuation Fairly Valued
! 8 Warning Signs
View Full Analysis

What is Asia Metal PCL Construction In Progress?

Asia Metal PCL BKK:AMC +0.97% 68 Construction In Progress is ฿0 Mil as of Mar. 2026. GuruFocus rates BKK:AMC with a GF Score™ of 68/100 and a GF Value™ of ฿2.18 (Fairly Valued). The stock has 8 warning signs investors should review.

Asia Metal PCL's quarterly construction in progress increased from Sep. 2025 (฿0 Mil) to Dec. 2025 (฿976 Mil) but then declined from Dec. 2025 (฿976 Mil) to Mar. 2026 (฿0 Mil).

Asia Metal PCL's annual construction in progress increased from Dec. 2023 (฿596 Mil) to Dec. 2024 (฿849 Mil) and increased from Dec. 2024 (฿849 Mil) to Dec. 2025 (฿976 Mil).


Asia Metal PCL Construction In Progress Historical Data

* Premium members only.

The historical data trend for Asia Metal PCL's Construction In Progress can be seen below:

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

Asia Metal PCL Construction In Progress Chart

Asia Metal PCL Annual Data
Trend Dec16 Dec17 Dec18 Dec19 Dec20 Dec21 Dec22 Dec23 Dec24 Dec25
Construction In Progress
Get a 7-Day Free Trial Premium Member Only Premium Member Only 146.30 395.69 595.67 848.64 976.05

Asia Metal PCL Quarterly Data
Jun21 Sep21 Dec21 Mar22 Jun22 Sep22 Dec22 Mar23 Jun23 Sep23 Dec23 Mar24 Jun24 Sep24 Dec24 Mar25 Jun25 Sep25 Dec25 Mar26
Construction In Progress Get a 7-Day Free Trial Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only 0.00 0.00 0.00 976.05 0.00
BKK:AMC
68GF Score
Asia Metal PCL BKK:AMC
Construction In Progress is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Asia Metal PCL Construction In Progress Calculation

It records the cost of construction work, which is not yet completed (typically, applied to capital budget items). A construction in progress item is not depreciated until the asset is placed in service. Normally, upon completion, a construction in progress item is reclassified, and the reclassified asset is capitalized and depreciated.

What does a Construction In Progress of ฿0 Mil mean?
Asia Metal PCL (BKK:AMC) has a Construction In Progress of ฿0 Mil as of Mar. 2026. Construction in Progress records the amount of construction work that is not complete. View historical data on Asia Metal PCL and its competitors.
Is Asia Metal PCL's Construction In Progress too high?
Asia Metal PCL's current Construction In Progress is ฿0 Mil. Overall, Asia Metal PCL has a GF Score™ of 68/100 and is considered Fairly Valued, reflecting its overall financial health beyond just this single metric.
How does Asia Metal PCL's Construction In Progress compare to NUE and STLD?
Asia Metal PCL's Construction In Progress of ฿0 Mil can be compared against companies in the Steel industry. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good Construction In Progress for a Steel company?
A good Construction In Progress depends on the Steel industry context. However, Construction In Progress should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high Construction In Progress mean?
A high Construction In Progress can signal that a stock is expensive relative to its fundamentals. Construction in Progress records the amount of construction work that is not complete. View historical data on Asia Metal PCL and its competitors. Asia Metal PCL's current Construction In Progress is ฿0 Mil. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is Asia Metal PCL stock overvalued right now?
Based on GuruFocus' analysis, Asia Metal PCL (BKK:AMC) is currently considered Fairly Valued. The stock's GF Value™ is ฿2.18, compared to a current price of ฿2.08 — trading 4.6% below its estimated fair value. The current Construction In Progress is ฿0 Mil. Asia Metal PCL's overall GF Score™ is 68/100 with 8 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is Construction In Progress calculated?
Construction In Progress is calculated from a company's financial statements. For Asia Metal PCL (BKK:AMC), the current Construction In Progress is ฿0 Mil as of Mar. 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is Asia Metal PCL (BKK:AMC) Overvalued in 2026?

Based on GuruFocus' analysis, Asia Metal PCL stock appears to be undervalued. The current stock price of ฿2.08 is trading 4.6% below its estimated GF Value™ of ฿2.18. GuruFocus considers Asia Metal PCL to be Fairly Valued.

Key valuation signals for BKK:AMC:

  • Construction In Progress: ฿0 Mil
  • GF Value™: ฿2.18 vs. price of ฿2.08 (4.6% below fair value)
  • GF Score™: 68/100 with 8 warning signs

No single metric tells the full story. See the BKK:AMC stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


Asia Metal PCL Business Description

Address Srinakarin Road, 55, 55/1 Moo 2 Soi Watnamdaeng, Tambol Bangkaew, Amphur Bangplee, Samutprakarn, THA, 10540
Asia Metal PCL is engaged in manufacturing and trading processed steel products and rendering service for the manufacturing of processed steel. Its products include integrated steel roll coiled, both hot-rolled and cold-rolled type, the cut-and-steel sheet, and rolling a Little (slitting coil). The company also manufactures and distributes steel pipe and structural steel C-shape used by various industries. Its segment is the manufacturing and trading of processed steel products and rendering service for cutting and modifying steels. It has only one geographical segment because it operates only in Thailand.
68GF Score

Get the complete analysis for BKK:AMC

Construction In Progress is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

฿2.08
Price
฿2.18
GF Value