Electro Aco Altona (BSP:EALT4) Net Current Asset Value: R$-1.51 (As of Mar. 2026)

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

BSP:EALT4 Electro Aco Altona SA BSP:EALT4
79 GF Score
Price R$11.90
GF Value R$12.36
Valuation Fairly Valued
! 8 Warning Signs
View Full Analysis

What is Electro Aco Altona Net Current Asset Value?

Electro Aco Altona BSP:EALT4 -2.38% 79 Net Current Asset Value is R$-1.51 as of Mar. 2026. GuruFocus rates BSP:EALT4 with a GF Score™ of 79/100 and a GF Value™ of R$12.36 (Fairly Valued). The stock has 8 warning signs investors should review. Among 2,215 Industrial Products companies, Electro Aco Altona ranks worse than 45146.68% on this metric.

In calculating the Net Current Asset Value (NCAV), Benjamin Graham means a company's current assets (such as cash, marketable securities, and inventories) minus its total liabilities (including preferred stock, minority interest, and long-term debt).

Electro Aco Altona's net current asset value per share for the quarter that ended in Mar. 2026 was R$-1.51.

The historical rank and industry rank for Electro Aco Altona's Net Current Asset Value or its related term are showing as below:

BSP:EALT4's Price-to-Net-Current-Asset-Value is not ranked *
in the Industrial Products industry.
Industry Median: 5.19
* Ranked among companies with meaningful Price-to-Net-Current-Asset-Value only.

Electro Aco Altona  (BSP:EALT4) Net Current Asset Value Explanation

Benjamin Graham first discussed net current asset value (NCAV) in the 1934 edition of "Security Analysis", which he coauthored with David Dodd. In the book, (net) current asset value is defined as:" current assets alone, minus all liabilities and claims ahead of the issue."

The common definition of NCAV is: NCAV = current assets – [total liabilities + minority interest + preferred stock]

Net current assets exclude not only the intangible assets but also the fixed and miscellaneous assets. In addition, Graham believed that preferred stock belongs on the liability side of the balance sheet, not as part of capital and surplus. In "Security Analysis", preferred stock is dubbed "an imperfect creditorship position" that is best placed on the balance sheet alongside funded debt.

One research study, covering the years 1970 through 1983 showed that portfolios picked at the beginning of each year, and held for one year, returned 29.4 percent, on average, over the 13-year period, compared to 11.5 percent for the S&P 500 Index. Other studies of Graham’s strategy produced similar results.

Benjamin Graham looked for companies whose market values were less than two-thirds of their Net-Net Working Capital. They are collected under our Net-Net screener.


Electro Aco Altona Net Current Asset Value Related Terms


Electro Aco Altona Net Current Asset Value Historical Data

* Premium members only.

The historical data trend for Electro Aco Altona's Net Current Asset Value can be seen below:

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

Electro Aco Altona Net Current Asset Value Chart

Electro Aco Altona Annual Data
Trend Dec16 Dec17 Dec18 Dec19 Dec20 Dec21 Dec22 Dec23 Dec24 Dec25
Net Current Asset Value
Get a 7-Day Free Trial Premium Member Only Premium Member Only -4.25 -5.17 -4.30 -2.50 -1.90

Electro Aco Altona Quarterly Data
Jun21 Sep21 Dec21 Mar22 Jun22 Sep22 Dec22 Mar23 Jun23 Sep23 Dec23 Mar24 Jun24 Sep24 Dec24 Mar25 Jun25 Sep25 Dec25 Mar26
Net Current Asset Value Get a 7-Day Free Trial Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only Premium Member Only -1.38 -2.01 -1.19 -1.90 -1.51

BSP:EALT4 vs CRS, ATI, MLI: Net Current Asset Value Comparison

For the Metal Fabrication subindustry, Electro Aco Altona's Price-to-Net-Current-Asset-Value, along with its competitors' market caps and Price-to-Net-Current-Asset-Value data, can be viewed below:

* Competitive companies are chosen from companies within the same industry, with headquarter located in same country, with closest market capitalization; x-axis shows the market cap, and y-axis shows the term value; the bigger the dot, the larger the market cap. Note that "N/A" values will not show up in the chart.


Electro Aco Altona Price-to-Net-Current-Asset-Value vs Industrial Products Industry

For the Industrial Products industry and Industrials sector, Electro Aco Altona's Price-to-Net-Current-Asset-Value distribution charts can be found below:

* The bar in red indicates where Electro Aco Altona's Price-to-Net-Current-Asset-Value falls into.


BSP:EALT4
79GF Score
Electro Aco Altona SA BSP:EALT4
Net Current Asset Value is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Electro Aco Altona Net Current Asset Value Calculation

Electro Aco Altona's Net Current Asset Value (NCAV) per share for the fiscal year that ended in Dec. 2025 is calculated as

Net Current Asset Value Per Share(A: Dec. 2025 )
=(Total Current Assets-Total Liabilities-Minority Interest-Preferred Stock)/Shares Outstanding (EOP)
=(242.249-285.277-0-0)/22.649
=-1.90

Electro Aco Altona's Net Current Asset Value (NCAV) per share for the quarter that ended in Mar. 2026 is calculated as

Net Current Asset Value Per Share(Q: Mar. 2026 )
=(Total Current Assets-Total Liabilities-Minority Interest-Preferred Stock)/Shares Outstanding (EOP)
=(247.89-282.156-0-0)/22.649
=-1.51

* For Operating Data section: All numbers are indicated by the unit behind each term and all currency related amount are in USD.
* For other sections: All numbers are in millions except for per share data, ratio, and percentage. All currency related amount are indicated in the company's associated stock exchange currency.

What does a Net Current Asset Value of R$-1.51 mean?
Electro Aco Altona (BSP:EALT4) has a Net Current Asset Value of R$-1.51 as of Mar. 2026. Ben Graham's net current asset value equals the per-share value of total current assets less total liabilities. View historical data on Electro Aco Altona and its competitors. According to the industry distribution chart, Electro Aco Altona ranks #999999 out of 2215 companies in the Industrial Products industry.
Is Electro Aco Altona's Net Current Asset Value too high?
Electro Aco Altona's current Net Current Asset Value is R$-1.51. Based on the distribution chart, Electro Aco Altona ranks #999999 out of 2215 companies in the Industrial Products industry, which is in the bottom quartile relative to peers. Overall, Electro Aco Altona has a GF Score™ of 79/100 and is considered Fairly Valued, reflecting its overall financial health beyond just this single metric.
How does Electro Aco Altona's Net Current Asset Value compare to CRS and ATI?
According to the Industrial Products industry distribution chart, Electro Aco Altona ranks #999999 out of 2215 companies for Net Current Asset Value. This places Electro Aco Altona in the lower half of its industry. The industry median Net Current Asset Value is 5.19. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good Net Current Asset Value for an Industrial Products company?
The median Net Current Asset Value among Industrial Products companies is 5.19, based on 2,215 companies in the industry. Companies in the top quartile (top 25%) have a Net Current Asset Value significantly above this median, while those in the bottom quartile fall well below. However, Net Current Asset Value should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high Net Current Asset Value mean?
A high Net Current Asset Value can signal that a stock is expensive relative to its fundamentals. Ben Graham's net current asset value equals the per-share value of total current assets less total liabilities. View historical data on Electro Aco Altona and its competitors. For the Industrial Products industry, the median Net Current Asset Value is 5.19 — values significantly above this may indicate overvaluation, while values below may suggest a bargain or underlying issues. Electro Aco Altona's current Net Current Asset Value is R$-1.51. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is Electro Aco Altona stock overvalued right now?
Based on GuruFocus' analysis, Electro Aco Altona (BSP:EALT4) is currently considered Fairly Valued. The stock's GF Value™ is R$12.36, compared to a current price of R$11.90 — trading 3.7% below its estimated fair value. The current Net Current Asset Value is R$-1.51. Electro Aco Altona's overall GF Score™ is 79/100 with 8 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is Net Current Asset Value calculated?
Net Current Asset Value is calculated from a company's financial statements. For Electro Aco Altona (BSP:EALT4), the current Net Current Asset Value is R$-1.51 as of Mar. 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is Electro Aco Altona (BSP:EALT4) Overvalued in 2026?

Based on GuruFocus' analysis, Electro Aco Altona stock appears to be undervalued. The current stock price of R$11.90 is trading 3.7% below its estimated GF Value™ of R$12.36. GuruFocus considers Electro Aco Altona to be Fairly Valued.

Key valuation signals for BSP:EALT4:

  • Net Current Asset Value: R$-1.51
  • GF Value™: R$12.36 vs. price of R$11.90 (3.7% below fair value)
  • GF Score™: 79/100 with 8 warning signs

No single metric tells the full story. See the BSP:EALT4 stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


Electro Aco Altona Business Description

Other Exchanges EALT3:Brazil
Address Engenheiro Paulo Werner Street, 925, Blumenau, SC, BRA, 89030900
Electro Aco Altona SA manufactures steel based machinery & equipment. Its product portfolio comprises of carbon steel, high & low alloy steel, manganese steel & heat resistant steel castings. It caters to industries like earthmoving & mining.The company divides its business into two sectors: Repetitive and Custom. The Repetitive sector is responsible for series production of items for self-propelled equipment assemblers, including customers active in the segment of construction and mining machinery. The Custom sector produces customized parts and assemblies.
79GF Score

Get the complete analysis for BSP:EALT4

Net Current Asset Value is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

R$11.90
Price
R$12.36
GF Value