Muhibbah Engineering (M) Bhd (XKLS:5703) 5-Year Yield-on-Cost %: 5.77 (As of Jul. 27, 2026) — 118% Above Median

Author: Vera Yuan Vera Yuan
Vera Yuan
Vera Yuan
Director of Data and Quant Analytics at GuruFocus
Focused on building reliable datasets, financial models, and research tools for value-minded investors. Committed to turning complex data into practical guidance for value-investing and long-term wealth.
Reviewed by: Charlie Tian Charlie Tian
Charlie Tian
Charlie Tian
Founder & CEO of GuruFocus
Dr. Charlie Tian is the founder and CEO of GuruFocus.com, a leading global investment research platform established in 2004. With a Ph.D. in physics, Dr. Tian transitioned from science to finance, applying a data-driven, disciplined approach to value investing.

XKLS:5703 Muhibbah Engineering (M) Bhd XKLS:5703
52 GF Score
Price RM0.52
GF Value RM0.59
Valuation Modestly Undervalued
! 8 Warning Signs
View Full Analysis

What is Muhibbah Engineering (M) Bhd 5-Year Yield-on-Cost %?

Muhibbah Engineering (M) Bhd XKLS:5703 52 5-Year Yield-on-Cost % is 5.77 as of Jul. 27, 2026, which is 118% above its 10-year median of 2.65. GuruFocus rates XKLS:5703 with a GF Score™ of 52/100 and a GF Value™ of RM0.59 (Modestly Undervalued). The stock has 8 warning signs investors should review. Among 1,009 Construction companies, Muhibbah Engineering (M) Bhd ranks better than 69.57% on this metric.

Muhibbah Engineering (M) Bhd's yield on cost for the quarter that ended in Mar. 2026 was 5.77.


The historical rank and industry rank for Muhibbah Engineering (M) Bhd's 5-Year Yield-on-Cost % or its related term are showing as below:

XKLS:5703' s 5-Year Yield-on-Cost % Range Over the Past 10 Years
Min: 1.7   Med: 2.65   Max: 9.75
Current: 5.77


During the past 13 years, Muhibbah Engineering (M) Bhd's highest Yield on Cost was 9.75. The lowest was 1.70. And the median was 2.65.


XKLS:5703's 5-Year Yield-on-Cost % is ranked better than
69.57% of 1009 companies
in the Construction industry
Industry Median: 3.42 vs XKLS:5703: 5.77

Muhibbah Engineering (M) Bhd  (XKLS:5703) 5-Year Yield-on-Cost % Explanation

Of course the risk here is that the company may not raise its dividends as it did before. The key is to select the companies that can consistently raise its dividends. Usually companies with long history of raising dividends tend to do so.


Muhibbah Engineering (M) Bhd 5-Year Yield-on-Cost % Related Terms


XKLS:5703 vs PWR, FIX, EME: 5-Year Yield-on-Cost % Comparison

For the Engineering & Construction subindustry, Muhibbah Engineering (M) Bhd's 5-Year Yield-on-Cost %, along with its competitors' market caps and 5-Year Yield-on-Cost % data, can be viewed below:

* Competitive companies are chosen from companies within the same industry, with headquarter located in same country, with closest market capitalization; x-axis shows the market cap, and y-axis shows the term value; the bigger the dot, the larger the market cap. Note that "N/A" values will not show up in the chart.


Muhibbah Engineering (M) Bhd 5-Year Yield-on-Cost % vs Construction Industry

For the Construction industry and Industrials sector, Muhibbah Engineering (M) Bhd's 5-Year Yield-on-Cost % distribution charts can be found below:

* The bar in red indicates where Muhibbah Engineering (M) Bhd's 5-Year Yield-on-Cost % falls into.


XKLS:5703
52GF Score
Muhibbah Engineering (M) Bhd XKLS:5703
5-Year Yield-on-Cost % is just one metric. See GF Score™, valuation, warning signs, and more.
View Full Analysis

Muhibbah Engineering (M) Bhd 5-Year Yield-on-Cost % Calculation

Dividend Yield % and dividend growth of a stock is an important factor for income investors. But if company A raises its dividend constantly faster than company B, company A's future dividend yield might be much higher than Company B's even if their yields are the same now and their stock prices do not change.

Yield on Cost assumes that you buy and the stock today, and hold it for 5 years. If the company raises it dividends at the same rate as it did over the past 5 years, the dividends investors receive annually in 5 years relative to the stock price today.

Therefore, Yield-on-Cost of Muhibbah Engineering (M) Bhd is calculated as

Yield-on-Cost=Dividend Yield %*(1+Dividend Growth Rate)^5
Frequently Asked Questions Learn more about 5-Year Yield-on-Cost % →
What does a 5-Year Yield-on-Cost % of 5.77 mean?
Muhibbah Engineering (M) Bhd (XKLS:5703) has a 5-Year Yield-on-Cost % of 5.77 as of Jul. 27, 2026. 5-Year Yield on Cost measures the expected yield based on a company's current yield and 5-year dividend growth. View historical data on Muhibbah Engineering (M) Bhd and its competitors. This is 118% above median its historical median of 2.65. Over the past decade, Muhibbah Engineering (M) Bhd's 5-Year Yield-on-Cost % has ranged from 1.70 to 9.75. According to the industry distribution chart, Muhibbah Engineering (M) Bhd ranks #307 out of 1009 companies in the Construction industry, placing it in the top 30.4%.
Is Muhibbah Engineering (M) Bhd's 5-Year Yield-on-Cost % too high?
Muhibbah Engineering (M) Bhd's current 5-Year Yield-on-Cost % of 5.77 is 118% above median its 10-year median of 2.65. Over the past 10 years, this metric has ranged from a low of 1.70 to a high of 9.75. The Construction industry median 5-Year Yield-on-Cost % is 3.42. Muhibbah Engineering (M) Bhd's value of 5.77 is 68.7% above this industry median. Based on the distribution chart, Muhibbah Engineering (M) Bhd ranks #307 out of 1009 companies in the Construction industry, which is above the industry midpoint. Overall, Muhibbah Engineering (M) Bhd has a GF Score™ of 52/100 and is considered Modestly Undervalued, reflecting its overall financial health beyond just this single metric.
How does Muhibbah Engineering (M) Bhd's 5-Year Yield-on-Cost % compare to PWR and FIX?
According to the Construction industry distribution chart, Muhibbah Engineering (M) Bhd ranks #307 out of 1009 companies for 5-Year Yield-on-Cost %. This puts Muhibbah Engineering (M) Bhd in the upper half of its industry. The industry median 5-Year Yield-on-Cost % is 3.42. Muhibbah Engineering (M) Bhd's value of 5.77 is 68.7% above this benchmark. Historically, Muhibbah Engineering (M) Bhd's own 5-Year Yield-on-Cost % has ranged from 1.70 to 9.75 over the past decade. While the company's 10-year median is 2.65 vs. the industry median of 3.42, Muhibbah Engineering (M) Bhd has consistently been above the industry average. See the competitive comparison table and distribution chart on this page for a detailed peer-by-peer breakdown.
What is a good 5-Year Yield-on-Cost % for a Construction company?
The median 5-Year Yield-on-Cost % among Construction companies is 3.42, based on 1,009 companies in the industry. Companies in the top quartile (top 25%) have a 5-Year Yield-on-Cost % significantly above this median, while those in the bottom quartile fall well below. However, 5-Year Yield-on-Cost % should not be evaluated in isolation — investors should consider it alongside profitability, growth, and financial strength metrics. Muhibbah Engineering (M) Bhd's current 5-Year Yield-on-Cost % of 5.77 is 68.7% above the industry median. Use the industry distribution chart on this page to see where any company falls relative to its peers.
What does a high 5-Year Yield-on-Cost % mean?
A high 5-Year Yield-on-Cost % can signal that a stock is expensive relative to its fundamentals. 5-Year Yield on Cost measures the expected yield based on a company's current yield and 5-year dividend growth. View historical data on Muhibbah Engineering (M) Bhd and its competitors. For the Construction industry, the median 5-Year Yield-on-Cost % is 3.42 — values significantly above this may indicate overvaluation, while values below may suggest a bargain or underlying issues. Muhibbah Engineering (M) Bhd's current 5-Year Yield-on-Cost % is 5.77, which is 118% above median its own 10-year median of 2.65. However, context matters — high-growth companies often justify higher valuations. Always evaluate alongside other metrics like GF Score™ and GF Value™.
Is Muhibbah Engineering (M) Bhd stock overvalued right now?
Based on GuruFocus' analysis, Muhibbah Engineering (M) Bhd (XKLS:5703) is currently considered Modestly Undervalued. The stock's GF Value™ is RM0.59, compared to a current price of RM0.52 — trading 11.9% below its estimated fair value. The current 5-Year Yield-on-Cost % is 5.77, which is 118% above median its 10-year median of 2.65 and 68.7% above the Construction industry median of 3.42. Muhibbah Engineering (M) Bhd's overall GF Score™ is 52/100 with 8 warning signs to review. Investors should evaluate multiple metrics — including profitability, growth, and financial strength — before making a decision.
How is 5-Year Yield-on-Cost % calculated?
5-Year Yield-on-Cost % is calculated from a company's financial statements. For Muhibbah Engineering (M) Bhd (XKLS:5703), the current 5-Year Yield-on-Cost % is 5.77 as of Jul. 27, 2026. GuruFocus calculates this using data sourced from SEC filings and annual reports. See the calculation section and 30-year financial data on this page for the full breakdown.

Is Muhibbah Engineering (M) Bhd (XKLS:5703) Overvalued in 2026?

Based on GuruFocus' analysis, Muhibbah Engineering (M) Bhd stock appears to be undervalued. The current stock price of RM0.52 is trading 11.9% below its estimated GF Value™ of RM0.59. GuruFocus considers Muhibbah Engineering (M) Bhd to be Modestly Undervalued.

Key valuation signals for XKLS:5703:

  • 5-Year Yield-on-Cost %: 5.77 (118% above median its 10-year median of 2.65)
  • GF Value™: RM0.59 vs. price of RM0.52 (11.9% below fair value)
  • GF Score™: 52/100 with 8 warning signs
  • Industry Position: 68.7% above the Construction median (#307 of 1009)

No single metric tells the full story. See the XKLS:5703 stock analysis page for a complete view including 30-year financials, guru trades, and insider activity.


Muhibbah Engineering (M) Bhd Business Description

Address Jalan Batu Tiga Lama, Lot 579 & 586, 2nd Mile, Klang, MYS, 41300
Muhibbah Engineering (M) Bhd is engaged in providing oil and gas, marine, infrastructure, civil, and structural engineering contract works. In addition to these, it also manufactures engineering products and distributes and markets construction materials. The segments in which the Group operates include Infrastructure Construction, Cranes, Marine shipbuilding and ship repair, and Concession. The business activity of the company functions in Asia, Europe, America, the Middle East, and Australia.
52GF Score

Get the complete analysis for XKLS:5703

5-Year Yield-on-Cost % is just one metric. See GF Value™, 30-year financials, guru trades, warning signs, and more.

RM0.52
Price
RM0.59
GF Value